HYGIENE PRODUCTS MACHINES
JUST IN ONE PLACE - THE ULTIMATE SOLUTIONS

Professional in converting and packaging solutions for the disposable hygiene industry in baby, adult and lady segments. This ultimate solution guide would help you everything about producing hygiene products. With high-end equipment and skilled staff, we are capable of fulfilling your customization needs for your machines!

machine page book

Download this page as a PDF

To save your time, we have also prepared a PDF version containing all the contents of this page, only leave your email and you will get the download link immediately.

Why Choose Sunree?

We are a company that values customers’ satisfaction. We always aim at producing and delivering quality products that meet all your needs. Sunree is able to lead you by hand in your hygiene business everywhere.

With 10+ years of experience, Sunree is well versed in this field. Yes, you are dealing with masters. You can trust them with your needs and expectations.

Need proof? Why don’t you contact us and we can schedule a zoom inspection session for you. We do not promote physical inspection at the moment because of the COVID-19 pandemic. However, this activity will resume as soon as the pandemic is over.

Want to know how we can do business?

machine manufacturing workshop

Hot Products In The Field

Disposable hygiene products can be produced, including baby diaper, men nappy, adult diaper, diaper pants, women’s sanitary napkins and pantyliner, menstrual pants, underpads, pet diaper, etc.

Our long involvement in disposable hygiene solutions enables you to access to extensive technological and application expertise.

I-shaped baby diaper

I-shaped Baby Diaper

t-shaped baby diaper

T-shaped Baby Diaper

baby pants

Baby Pants

sanitary napkins strip pack

Sanitary Napkins Strip Pack

sanitary napkins easy pack

Sanitary Napkins Easy Pack

sanitary napkins with leak cuff

Sanitary Napkins Three Piece Lamination Top Sheet

pantyliner

Pantyliner

menstrual pants​

Menstrual Pants

adult diaper

Adult Diaper

adult pants

Adult Pants

underpads

Underpads

pet diaper

Pet Diaper

Quality Assurance

quality assurance

01

External processing inspection which before machines installation, there is drawing for every parts external processing which should be signed by technical director, we won’t adapt the drawing without sign. After finished parts processing, we have experienced QC engineer inspect according to drawing by all kinds of measuring tools, if approve inspection (if in 13 TOLERANCE grade range), then can be warehouse in and wait for installation; if not pass inspection, will be rework or scrap disposal, for special parts which have size discrepancy, will be inspected and decided by production manager, so that oaccuracy rate for our parts on the equipments can reach 100%.

quality assurance

02

Inspection after equipments’ finishing. Equipments will be installed by experienced master and after first step testing, will be checked by installation master, responsible installation master will connect and install all the equipments which customer purchased in our workshop, inspect equipments’ shake and noise, find problem and solve it before delivery, finally report to production department for recording; Sunree will make marks among equipments and video for these equipments before disassembling, so that can assure high efficiency installation in customer’s plant.

Dynamic Balance Test

The dynamic balance test of the rotating part is carried out by the domestic advanced balancing machine, according to different speed and loads of the spare parts, to ensure all spare parts are stable during machine running.

Hardness & Heat Treatment Test

The metal material requirement is higher for core parts, so we use new materials at home and abroad, to establish our standard heat treatment processing, and also use hardness testing , to improve hardness of spare parts and increase resistance.

Measure Of Precision

Precision testing includes dimension tolerance and shape tolerance testing, we use specific testing equipment to ensure the accurate of each spare part.

After Sales Services

Phone Assistance

Remote Teleservicing

On-site Support

Production Assistance

Training

Maintenance

Technical Analysis

Spare Parts Support

Upgrades And Retrofits

Life-time Assistance

Professional Technical Personnels

Our service and spare parts department are efficient and rapid due to the fact we have our very own highly skilled technicians.

International Universal Parts

We use 80% of internationally, universal, electrical components to facilitate our customers maintenance needs.

After-sales Service & Maintenance

Our salesmen and engineers will pay annual visits to our customers for regular checking and offering maintenance suggestions, to make their production lines keep running perfectly.

Quality Management During Production

Processing components and part with superior manufacturing equipments and testing devices, and in accordance with ISO9001, Sunree carries out strict quality management during production.

Warranty Time

12 months as warranty time, life-time assistance.

Installation Engineers

Installation engineers have rich debugging experience overseas.

Baby Diaper Machine

We have gathered different features both from domestic and abroad to enhance the functions of our machines. There are different baby diaper sizes for different markets, you can choose the sizes from newborns to infants and implement into one machine.

Full Servo I-shaped Baby Diaper Machine

Hot

Full Servo T-shaped Baby Diaper Machine

Full Servo Baby Pants Machine

Feminine Napkin Machine

Our sanitary napkin making machines are ideal for producing high-quality sanitary pads. The machine is robust and easy to operate. All machine parts are from well-known brands to ensure superior performance. We recommend to produce two different sizes to avoid compromising the stability of the machine and quality of products, for example 240mm/280mm, 280mm/320mm.

Full Servo Pantyliner Machine

Full Servo Feminine Sanitary Napkins Machine

HOT

Full Servo Menstrual Pants Machine

Adult Incontinence Product Machine

Each of our incontinence diaper machines can produce a different style including I shape or T shape. Customize your machines to make different sizes of adult diaper, adult pants, menstrual pants – medium, large, and x-large.

Full Servo Adult Diaper Machine

Full Servo Adult Diaper Pants Machine

Full Servo Underpads Machine

Wanna Auto Stacker, Bagger and Packaging Machine?

You can leave us your email here and our experienced team will contact with you within 24 hours.

fully automatic diapers packing machine​

Fully Automatic Diapers Packing Machine

Speed: 40 packs/min for premade bag

semi automatic diapers packing machine​

Semi Automatic Diapers Packing Machine

Speed: 35 packs/min for premade bag

full servo high speed sanitary napkins packing machine

Full Servo Sanitary Napkins Packing Machine

Speed: 40-60 packs/min

full servo high speed auto stacker​

Full Servo High Speed Auto Stacker

Speed: 1000 pcs/min, 50 push/min

Manufacturing Process Flow

The final cost depends on the customized service you require, the component parts used, the relevant national laws, and the distance of transportation. Take the example of purchasing a baby diaper machine:

designing

1

Designing a machine that meets your requirements

The first phase for each project is feasibility studies, product positioning, understanding the product specification and structure, specific raw materials used, technical details and the expected functions of the machine, certification of electrical parts, we will find the best solution for you. Sunree will work with you closely to design the machine upon receipt of your confirmation.

parts testing

2

Resource integration, CNC machine parts manufacturing and quality control

After the machine design is confirmed, we will work for component parts processing in CNC centre, and purchase of high-precision parts and components used in the machine.
All component parts have to go through testing within the quality control department in accordance with ISO9001 quality control system. Sunree makes sure that each part is of the exact same quality and size as indicated on the machine design.

machinery assemble

3

Machine assembly and calibrating

We assemble the machine according to the drawing at the assembly facility by the use of high precision mechanical tooling and full-servo technology with high automation levels. Then calibrate the machine and put it into trial operation. We start by setting standards of production speed, stability and product performance, then start the machine and test its actual performance. Sunree skillful and well-experienced professional engineers will work together on the calibration and modification to meet your demands.

machine test run

4

Machine delivery, field installation, commissioning and training

After calibrating the machine, we will invite the customer to inspect the machine at our factory to confirm the machine’s performance, and then arrange the delivery.
After the machine has reached the customer’s plant, Sunree engineers will be assigned on-site, taking care of the assemble and calibration, and train your staff.

The FAQs Throughout The Process

Do you have reference project?

We have reference project in most countries, if we get the permission of the customer who has brought the machines from us, we can tell you their contact imformation, you can go to visit their factory.

You are always welcome to come to visit our company, and see the machine running in our factory and our domestic customer’s factory, we can pick you up from the station near our city.

Contact us, you can get video of our reference running machine.

Do you provide turnkey project?

Turnkey project available.

We can help you to start a new company in personal hygiene product making. Please contact with our team.

Do you provide customized service?

We can design the machines according your requirements (product type, power, package type and so on), at the same time we will give you professional suggestion by many years industrial experience.

Do you have any certificate?

We have been certificated by the famous certification authority, such as CE.

What’s your guarantee or the warranty of the quality?

We offer you high quality machines with 1 year guarantee and supply life-time technical support.

What’s your delivery term?

EXW, FOB, CFR, CIF delivery terms.

What’s your payment term?

30% of total value is required as down payment upon the confirmation of the Contract and 70% to be paid before delivery.

When can I get my machine after I paid?

Small machine production time is around 30-60days, such as tissue paper machine, wet wipes machine. Big machine needs about 150-180days, such as baby diaper machine, sanitary napkins machine.

The exactly depend on what kind of machine you order. The shipping time is based on your destination port.

How about the packaging details?

Standard export packing.

As specific requirement, major products using export plywood case packing, small products use thick carton packing, ensure that the product packaging integrity and safety.

How to test machine before delivery?

The buyer dispatch the team to inspect the machine at our factory. Raw materials are covered by the buyer if the testing over 30minutes, Inspection standard as the the confirmed product drawing, working speed and hygiene national standard.

When can I get engineers from you?

You should make sure every preparation works are ready (electricity, air supply, materials), then contact with our sales people, we will dispatch engineer to install the machine for you, and train your employees to use the machine well. Normally when your preparation is done, you can contact with our sales people and cooperate us to get the visa for the engineer and our engineer will be there within 15 days.

How to install my machines when it arrives? And the cost?

We will dispatch our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay the engineer’s expenses (including return air tickets, accommodation and USD100/day/person.

How long time for installation?

According your machines order, we will dispatch one or two engineers (mechanical engineer and electrical engineer) to your plant, the working time per day is 8 hours, it will take about 15 days to 20 days.

How about the spare parts?

We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.

Contact Sunree to Start Your Business

Have a look at how some of our customers perceive our products and services:

Ask For A Quick Quote

Tell us what kind of support you need, we will reach out to you within 1 working day, please pay attention to the email with the suffix “@ sunreehygiene.com”